New 19,200SF Standard Reference Material (SRM) Warehouse Addition with 3,200SF Mezzanine, masonry wall bearing with steel joists & metal deck construction. Scope includes site excavation, erosion controls, asphalt & concrete paving, chainlink fencing, grasses & plants, storm piping, cast-in-place concrete, CMU & brick masonry, cast stone sill, structural steel, joists, metal decking, misc metals, architectural casework, self-adhering & crystalline waterproofing, built-up roofing, tapered insulation, joint sealants, metal doors & hardware, overhead coiling & sectional doors, aluminum windows, metal louvers, louvered penthouses, gypsum board, acoustical ceiling, ceramic tile, polyurethane & epoxy resin flooring, carpet tile, painting, interior signage, toilet accessories, fire extinguishers, metal lockers, dock leveler, dock bumpers, projection screen, window blinds, plumbing HVAC, DDC controls, hydronic piping, liquid nitrogen piping, air curtains, electrical, engine generator, lightning protection, communication cabling, addressible fire alarm, commissioning plumbing, HVAC & electrical. Wage Scale Required. Estimated cost range $5 to $10 million, duration 485 calendar days. CD drawings and specs available.